
A Production Windchill Upgrade: 40 Phases, Zero Failures, Zero Outage
40 of 40 migration phases, zero failures, zero production outage.
Read customer storyChoosing a partner
Buyer’s Guide
The partner you choose will matter more than the version of Windchill you buy. This is how to evaluate one — the criteria that actually predict whether the system gets used, the questions that expose a weak firm, and the honest answer to “should we just use PTC's own services?”
Talk to a consultantLast reviewed by Element Consulting

Windchill's data model, change process and CAD integration are their own discipline. A firm that has done Teamcenter or ENOVIA has not done Windchill.
The answer tells you whether you're hiring the people on the website or the people on the bench.
Most Windchill implementations are technically successful and practically abandoned. The partner should be able to tell you what adoption looked like six months after their last go-live.
If either is quoted as a separate phase, the estimate is incomplete.
You should own the system, the configuration and the knowledge when they leave.
PTC Windchill is a mature, capable platform. The variance in outcomes between companies running it is not a variance in software. It is a variance in who configured it, how they mapped it to the way engineering and manufacturing actually work, whether the data that went in was clean, and whether anyone was accountable for people using it after the consultants left.
The firms that fail at this are rarely incompetent. They are usually generalists — capable PLM consultants who treat Windchill as one platform among several — or specialists whose real business is licensing, for whom implementation is the thing they do to close the sale.
Ask how many Windchill implementations the firm has delivered, on which versions, and in which modules — PDMLink, MPMLink, ProjectLink, Windchill+. Then ask which of those the people who'll be on your project delivered. A firm with a deep bench on Teamcenter and two Windchill projects is a Teamcenter firm.
How Element fits: Windchill is nearly all of what we do. 100+ PLM implementations since 2003, PTC Certified Windchill Implementation Practitioners on the team, and the same people who configured the last system configure the next one.
There is a difference between a consultant who has configured Windchill and one who has lived with the consequences. Ask for an example of a decision they made in configuration that turned out to be wrong, and what they changed. A firm that can't answer that has never stayed long enough to find out.
Aerospace and defense, medical devices, automotive and industrial equipment each impose different requirements on Windchill — ITAR data controls, FDA design-history-file traceability, PPAP documentation, engineer-to-order configuration. A partner should be able to describe the specific Windchill configuration decisions your industry forces, before you tell them.
How Element fits: Aerospace & defense and medical devices are the majority of our work. We deliver in ITAR-controlled and government-cloud environments, and the Windchill configuration for AS9100 and 21 CFR 820 traceability is work we've done repeatedly, not work we'd be learning on you.
Windchill does not run alone. It connects to ERP — SAP, Oracle, Dynamics — to MES, to CAD, and often to QMS. A partner who quotes the Windchill implementation and treats integration as a later phase has quoted half a project. Ask which ERP integrations they have delivered and how — PTC's ESI framework, middleware, or custom — and what went wrong on the last one.
How Element fits: ERP–PLM integration is a core service, not a partner referral. We have delivered Windchill to SAP, Oracle and Dynamics 365, and the failure points on each are documented on this site because we've hit them.
Migration is where implementations go over budget and past deadline. Ask how they handle legacy CAD relationships, duplicate part numbers, revision history, and what "clean" means for your data before it goes in. The right answer includes a pilot, validation scripts, and a stated position on how much history to migrate versus archive.
Most Windchill implementations are technically complete and practically unused. Engineers keep working in Excel; manufacturing doesn't trust the BOM; "phase two" never happens. Ask the partner what adoption looked like at their last three go-lives, six months later. Ask who on their team owns organizational change management — not training, change management — and what that person does.
How Element fits: Process and people first, technology second. It's the order we've used on every implementation, because a Windchill system nobody works in is a very expensive document repository. We have OCM leads on staff, not a training deck.
When the partner leaves, you should own the configuration, the documentation, and enough internal capability to run the system without calling them. Ask what the handoff looks like. A firm that's vague about this is planning to be your permanent administrator.
How Element fits: We train your champions, document everything, and aim for you not to need us. That's also why clients come back for the next project — because the first one worked.
Mostly, this isn't a choice anymore. In June 2022, PTC sold a substantial portion of its PLM professional services business — roughly 160 consultants — to ITC Infotech, which created DxP Services from it. PTC's own Windchill+ guide now says “most customers will utilize an implementation partner” and describes PTC's role as an Implementation Assurance Service that supports partner-led engagements.
So the real question is which partner shape fits. DxP carries the PTC heritage and is PTC's preferred partner for Windchill+ conversions; it's built for enterprise programs. For anything involving heavy ERP integration, regulated-industry traceability, a difficult migration, or an organization with strong existing processes that Windchill needs to fit rather than replace, an independent specialist with depth in your industry will usually deliver a system that gets used — and one you own when they leave.
The four partner shapes, by situationYou're hiring a bench you haven't met.
Go-live is a date, not an outcome.
The estimate is incomplete by design.
Ask to speak to a client whose implementation is more than a year old.
You already bought the platform. You're buying the implementation.
Both are the same problem.
We recently ran a production Windchill 12 → 13.1 upgrade with 40 of 40 migration phases succeeding, zero failures and zero outage — because we rehearse, verify, and draw the line at reversibility, not difficulty.
About Element Consulting. Element Consulting is an independent PTC partner that has implemented, upgraded, integrated, and rescued PTC Windchill since 2003: 100+ PLM implementations, a senior-only team, headquartered in West Des Moines, Iowa. Managing Partner Eric Horn is a PTC Certified Windchill Implementation Practitioner. The firm works mainly in aerospace and defense, federal and national-security programs, medical devices, and industrial equipment, including ITAR-controlled and government-cloud delivery, and does not resell software.

40 of 40 migration phases, zero failures, zero production outage.
Read customer story
eBOM-to-mBOM in MPMLink, with one revision control across PLM and ERP.
Read customer storyIt depends on what you need. Large SIs bring scale for global rollouts; PTC resellers bring licensing relationships; independent specialists bring depth in specific industries and integration patterns. Element Consulting is an independent, senior-only Windchill specialist focused on aerospace & defense, medical devices, automotive and industrial equipment, with 100+ PLM implementations since 2003. The right partner is the one whose last three projects look like yours.
Windchill-specific depth, named people, industry experience in your industry, integration and migration treated as core scope, a written adoption plan, and a clear knowledge-transfer handoff. The seven criteria above are the evaluation.
Yes. Element delivers Windchill in ITAR-controlled and government-cloud environments for aerospace and defense manufacturers, including configuration management and AS9100 traceability. See our aerospace & defense page and the defense contractor case study.
PDMLink is the core Windchill module and most Windchill specialists implement it. Element implements PDMLink alongside MPMLink for manufacturing process management, with ERP integration built into the scope rather than quoted separately.
PTC sold most of its PLM services business to ITC Infotech in June 2022 (now DxP Services), and PTC's own guidance directs customers to partners. DxP is the right call for large programs and Windchill+ conversions. For heavy ERP integration, regulated-industry traceability, a difficult migration, or an organization whose processes Windchill needs to fit, an independent specialist with depth in your industry usually delivers a system that gets used. The full comparison, by situation.
Discovery — documenting how engineering and manufacturing actually work before anything is configured. A partner who starts with installation has skipped the step that determines whether the system fits.
Typically four to nine months for a mid-size manufacturer, moving through discovery, configuration, data migration, integration and adoption. Migration complexity and ERP integration scope are the two biggest variables.
Bring us the seven questions above, and ask us for a reference: we'll put you on the phone with a client whose Windchill has been live for more than a year.
